    The project server will be shut down from Dec 27, 0700 UTC to Dec 28, 1730 UTC because of maintenance work at the computing centre. We plan the following steps to minimize the impact of this.
    We will:


    • starting on Dec 20, increase the deadline for all workunits (the delay_bound) from 3.5 days to 10 days until the server is restarted.
    • increase the maximum number of workunits that can be sent to a host per day.
    • temporarily reduce the timespan that completed workunits are kept in the database.



    We are sorry for the inconvenience.

    Have a nice Holiday
    Nick
    ____________
    Nicolas Maire
    Swiss Tropical and Public Health Institute
    http://www.swisstph.ch

    Karl
    Send message
    Joined: Dec 19 07
    Posts: 1
    Credit: 3,812
    RAC: 0
    Message 4734 - Posted 19 Dec 2007 18:40:40 UTC

      Thanks for the Information.

      Profile m.mitch
      Avatar
      Send message
      Joined: Mar 8 06
      Posts: 43
      Credit: 101,219
      RAC: 27
      Message 4747 - Posted 22 Dec 2007 6:02:24 UTC

        Excellent idea adding that to the buttons on BOINC Manager.
        ____________


        Join the #1 Aussie Alliance on Malaria Control

        Profile maire
        Volunteer moderator
        Project administrator
        Project developer
        Project scientist
        Send message
        Joined: Nov 7 05
        Posts: 439
        Credit: 118,258
        RAC: 0
        Message 4784 - Posted 27 Dec 2007 20:29:58 UTC

          We\'re back online! The maintenance work at the computer center is already over, they told me that the second day was only a reserve. We\'ll slowly adjust the configuration back to the normal values (deadlines etc.)
          Nick
          ____________
          Nicolas Maire
          Swiss Tropical and Public Health Institute
          http://www.swisstph.ch

          Profile The Gas Giant
          Avatar
          Send message
          Joined: Mar 7 06
          Posts: 1214
          Credit: 3,720,648
          RAC: 1,417
          Message 4785 - Posted 27 Dec 2007 20:43:43 UTC

            The catchup period will be a good stress test of your systems!

            adrianxw
            Avatar
            Send message
            Joined: Mar 8 06
            Posts: 145
            Credit: 512,654
            RAC: 214
            Message 4787 - Posted 27 Dec 2007 23:52:06 UTC

              Welcome back, always nice when things take less time then expected, makes a rare change doesn\'t it!
              ____________
              Wave upon wave of demented avengers march cheerfully out of obscurity into the dream.

              Post to thread

              Message boards : Number crunching : Project downtime on Dec 27 and 28, 2007


              Return to malariacontrol.net main page


              Copyright © 2013 africa@home