It took your system way too long, nearly three days, to crunch this work unit. Your wingman did it in under two hours. There needs to be some kind of consistency for credit to be given. If you ever have a Malaria Control work unit take over 6 hours, I suggest aborting it and moving on to another.
ID: 18245 | Rating: 0 | rate: /
Reply
Quote
Gordon Lack Send message
Joined: Nov 27 11
Posts: 2
Credit: 165,068
RAC: 460
It always takes that sort of time. This is a low-powered ARM system (but is always on).
It's always got credit in the past for jobs it has completed on time, and there have been big elapsed time discrepancies there too.