3 days to counting workunit is bad


Advanced search

Message boards : Malaria Control : 3 days to counting workunit is bad

AuthorMessage
Zacatecnik
Send message
Joined: Jan 3 10
Posts: 2
Credit: 0
RAC: 0
Message 11716 - Posted 3 Jan 2010 17:01:55 UTC

    I am disagree with new(?) rule- 3 days for counting workunit(s). Almost 50 % my jobs are canceled in last minutes, because 3 days are too few. Please change it to almost 4 days!

    Profile Krunchin-Keith [USA]
    Volunteer moderator
    Volunteer tester
    Avatar
    Send message
    Joined: Nov 10 05
    Posts: 3319
    Credit: 5,590,758
    RAC: 462
    Message 11717 - Posted 3 Jan 2010 20:37:49 UTC - in response to Message 11716.

      Last modified: 3 Jan 2010 20:38:32 UTC

      I am disagree with new(?) rule- 3 days for counting workunit(s). Almost 50 % my jobs are canceled in last minutes, because 3 days are too few. Please change it to almost 4 days!


      This has been covered before as follows:
      Maire wrote:
      Most of the simulations running on malariacontrol.net serve the purpose of estimating parameters of the underlying mathematical models. In essence, we iteratively try a lot of different model parametrizations, and let an optimization algorithm decide which parameter set to try next. This process is more efficient if we use shorter deadlines. In other words, with the same number of computers, we can reach the same goals in shorter time if we use shorter deadlines.


      If you are getting too many tasks that get canceled, you probably should lower your queue size so as many do not accumulate and so that they get turned in before deadline.

      Zacatecnik
      Send message
      Joined: Jan 3 10
      Posts: 2
      Credit: 0
      RAC: 0
      Message 11742 - Posted 8 Jan 2010 14:15:42 UTC - in response to Message 11717.

        no... I work on two proeject: malaria control and Rosseta. It is very bad that 50 % of work on Malaria is canceled because 3 days dedalines and my low PC running time.

        Profile mikey
        Avatar
        Send message
        Joined: Mar 23 07
        Posts: 4688
        Credit: 5,419,466
        RAC: 467
        Message 11745 - Posted 9 Jan 2010 9:22:43 UTC - in response to Message 11742.

          no... I work on two proeject: malaria control and Rosseta. It is very bad that 50 % of work on Malaria is canceled because 3 days dedalines and my low PC running time.


          You may wish to consider another Project then, here is a link to all the active Distributed Computing Projects, the Boinc ones are noted:
          http://www.distributedcomputing.info/projects.html

          rick
          Avatar
          Send message
          Joined: Jul 24 10
          Posts: 4
          Credit: 376,464
          RAC: 0
          Message 13693 - Posted 6 Sep 2010 12:35:22 UTC

            Last modified: 6 Sep 2010 12:36:36 UTC

            I've noticed wu CPU times (2.6 GHz Phenom, allowing 100%), from between 24 minutes to almost 8 hours. I can see a 3 day deadline being a problem if one of these monter wu's gets sent to a box not allocating so much CPU time to malariacontrol. Is there any way to smooth the work out?

            Post to thread

            Message boards : Malaria Control : 3 days to counting workunit is bad


            Return to malariacontrol.net main page


            Copyright © 2013 africa@home